Sparely
DU

SLEEVE,SHAFT,DWG.141-5091,FOR PP-912

Material 4300037971 · SLEEVE · Plant 1000

BLong-leadReduceExcess
Material
4300037971
Category
SLEEVE
Base unit
EA
MRP type
Non Stock
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
CAHAYA TEKNIK PERSADA PT
Lead time
120 d · P80 210 d
Unit price
Rp 21.9M

Recommendation

  • 1.Forecast 0.6 EA/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~120 days; expected demand during lead time 0.2.
  • 3.A 98.5% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Stock 41 exceeds the level to keep (2) by 39.
  • 5.Long lead time: 80% of deliveries took up to 210 days and the fastest seen in its category 67 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle source
On hand / on order
41 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
98.5%
stockout risk now 0%
Unit price
Rp 21.9M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 93 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 199.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~67 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-912
BOTTOM PUMP
B120.62

Lead time and procurement

Lead time 120 ± 55 days (PO history + category, 1 PO lines) · on-time 36%

PR dateTypeQtyUnit priceDeliveryLead time
26 Jun 2026PR05
Project / turnaround
1Rp 21.9M10 Sept 202676 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
16 Jul 2026MediumPX_PP-912Replace bearing PP-912
03 May 2025MediumPX_PP-912PP-912 abnormal noise

Recent goods issues

Posting dateQtyOrderOrder type
30 Jun 20261201000006875Corrective