Sparely
DU

POSITIONER,VALVE,DWG.850-9432,FOR LCV-19

Material 4300038343 · POSITIONER · Plant 1000

BLong-leadReorderCriticalStockout
Material
4300038343
Category
POSITIONER
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
GUNUNG PERKASA NUSANTARA PT
Lead time
92 d · P80 166 d
Unit price
Rp 24.1M

Recommendation

  • 1.Forecast 0.7 EA/year: 0.7 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~92 days; expected demand during lead time 0.2.
  • 3.A 91.4% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 2 now.
  • 5.Long lead time: 80% of deliveries took up to 166 days and the fastest seen in its category 40 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
2 EA
Rp 48.2M · order by 01 Oct 2026
Expected arrival ≈ 92 days
Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
91.4%
stockout risk now 9%
Unit price
Rp 24.1M
PO history
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 136 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 76.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~40 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PY_LCV-191C
LEVEL CONTROL VALVE
B110.12

Lead time and procurement

Lead time 92 ± 64 days (PO history + category, 1 PO lines) · on-time 35%

PR dateTypeQtyUnit priceDeliveryLead time
29 Oct 2025PR03
Regular replenishment
1Rp 24.1M20 Jan 202683 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
03 May 2025MediumPY_LCV-191CPSM25/Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
18 May 20262204000026366Preventive