TRAY VALVE,DWG.167-6339,FOR CL-890
Material 4300039104 · TRAY VALVE · Plant 1000
BLong-leadReduceSlow-moving
- Material
- 4300039104
- Category
- TRAY VALVE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- CAHAYA LOGAM PRATAMA PT
- Lead time
- 80 d · P80 104 d
- Unit price
- Rp 243,029
Recommendation
- 1.Forecast 0.4 EA/year: 0.4 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~80 days; expected demand during lead time 0.1.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
- 4.Stock 21 exceeds the level to keep (3) by 18.
- 5.Long lead time: 80% of deliveries took up to 104 days and the fastest seen in its category 30 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle source
On hand / on order
21 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 243,029
PO history
ML early warning: 13% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 492 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 70.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~30 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PY_CL-890 CONDENSATE SCRUBBER | B | 1 | 3 | 1.23 |
Lead time and procurement
Lead time 80 ± 25 days (PO history + category, 1 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 03 May 2026 | PR05 Project / turnaround | 1 | Rp 243,029 | 22 Aug 2026 | 111 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 20 Jun 2026 | Low | PY_CL-890 | Leak from packing |
| 31 Jan 2026 | Medium | PY_CL-890 | Leak from packing |
| 31 May 2025 | Low | PY_CL-890 | Inspect CL-890 internal |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 27 May 2025 | 1 | 206000015882 | Other maintenance |