SEAT RING,VALVE,DWG.473-2080,FOR FCV-120

Material 4300039167 · SEAT RING · Plant 1000

CMaintainNo stock needed
Material
4300039167
Category
SEAT RING
Base unit
EA
MRP type
Non Stock
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
PERMATA INSTRUMEN INTERNASIONAL PT
Lead time
119 d · P80 184 d
Unit price
Rp 42.6M

Recommendation

  • 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~119 days; expected demand during lead time 0.0.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
Single sourceOpen PO
On hand / on order
0 / 2
next delivery 30 Jan 2027
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 42.6M
PO history
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 120,576/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~65 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-1206
CONTROL VALVE
C100.11

Lead time and procurement

Lead time 119 ± 58 days (PO history + category, 2 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
01 Aug 2026PR06
Regular replenishment
2Rp 43.2M30 Jan 2027
open
182 d
10 Feb 2026PR03
Regular replenishment
2Rp 42.0M02 May 202681 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Never issued in the 17-month history.