TRIM SET,CONTROL VALVE,DWG.648-1083,FOR
Material 4300041030 · TRIM SET · Plant 1000
BLong-leadReduceExcess
- Material
- 4300041030
- Category
- TRIM SET
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- SINAR SEJAHTERA LESTARI PT
- Lead time
- 162 d · P80 236 d
- Unit price
- Rp 247.7M
Recommendation
- 1.Forecast 1.2 SET/year: 1.2 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~162 days; expected demand during lead time 0.5.
- 3.A 84.3% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 3.
- 4.Stock 4 exceeds the level to keep (3) by 1.
- 5.Long lead time: 80% of deliveries took up to 236 days and the fastest seen in its category 75 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
4 / 1
next delivery 30 May 2027
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
3
order qty 3
Service level
84.3%
stockout risk now 1%
Unit price
Rp 247.7M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 106 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 153.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~75 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PCV-512A BY PASS DUCT | B | 1 | 0 | 0.08 |
Lead time and procurement
Lead time 162 ± 83 days (PO history + category, 1 PO lines) · on-time 33%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 04 Feb 2026 | PR06 Regular replenishment | 1 | Rp 250.3M | 30 May 2027 open | 480 d |
| 19 Dec 2025 | PR06 Regular replenishment | 2 | Rp 245.2M | 08 Jun 2026 | 171 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 17 Jun 2026 | 3 | 201000011352 | Corrective |