TRIM SET,CONTROL VALVE,DWG.970-4981,FOR
Material 4300041781 · TRIM SET · Plant 1000
BLong-leadReduceSlow-moving
- Material
- 4300041781
- Category
- TRIM SET
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- SAMUDRA MESINDO ABADI PT
- Lead time
- 132 d · P80 166 d
- Unit price
- Rp 234.7M
Recommendation
- 1.Forecast 0.6 SET/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~132 days; expected demand during lead time 0.2.
- 3.A 87.2% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
- 4.Stock 25 exceeds the level to keep (2) by 23.
- 5.Long lead time: 80% of deliveries took up to 166 days and the fastest seen in its category 75 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
25 / 2
next delivery 12 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
87.2%
stockout risk now 0%
Unit price
Rp 234.7M
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 397 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 151.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~75 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TCV-540B PP-402A TEMP CONTROL | B | 1 | 0 | 0.12 |
Lead time and procurement
Lead time 132 ± 85 days (PO history, 4 PO lines) · on-time 20%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 24 Aug 2026 | PR06 Regular replenishment | 1 | Rp 236.8M | 12 Oct 2026 open | 49 d |
| 18 Aug 2026 | PR05 Project / turnaround | 1 | Rp 240.5M | 19 Dec 2026 open | 123 d |
| 06 Jul 2025 | PR06 Regular replenishment | 2 | Rp 227.1M | 22 Aug 2025 | 47 d |
| 04 Jul 2025 | PR05 Project / turnaround | 2 | Rp 232.7M | 19 Feb 2026 | 230 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 30 Aug 2025 | 1 | 201000025465 | Corrective |
| 29 Aug 2025 | 2 | 201000025465 | Corrective |