Sparely
DU

TRIM SET,CONTROL VALVE,DWG.162-1687,FOR

Material 4300041988 · TRIM SET · Plant 1000

BLong-leadReorderNormalSlow-moving
Material
4300041988
Category
TRIM SET
Base unit
SET
MRP type
Stock Item
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
BERKAH REFRAKTORI PRATAMA PT
Lead time
153 d · P80 236 d
Unit price
Rp 26.2M

Recommendation

  • 1.Forecast 1.4 SET/year: 1.4 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~153 days; expected demand during lead time 0.6.
  • 3.A 96.3% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 2 now.
  • 5.Long lead time: 80% of deliveries took up to 236 days and the fastest seen in its category 75 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
2 SET
Rp 52.4M · order by 01 Oct 2026
Expected arrival ≈ 153 days
Long-leadSingle source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
96.3%
stockout risk now 4%
Unit price
Rp 26.2M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 262 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 283.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~75 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_LCV-1289C
LEVEL CONTROL VALVE
B110.55

Lead time and procurement

Lead time 153 ± 83 days (PO history + category, 2 PO lines) · on-time 43%

PR dateTypeQtyUnit priceDeliveryLead time
05 Dec 2025PR03
Regular replenishment
2Rp 25.9M14 Jun 2026191 d
09 Jun 2025PR06
Regular replenishment
2Rp 26.5M15 Sept 202598 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
22 Jun 2025MediumPX_LCV-1289CLCV-1289C; valve hunting

Recent goods issues

Posting dateQtyOrderOrder type
12 Jan 20263201000000139Corrective
11 Jan 20261201000000139Corrective