TRIM SET,CONTROL VALVE,DWG.162-1687,FOR
Material 4300041988 · TRIM SET · Plant 1000
BLong-leadReorderNormalSlow-moving
- Material
- 4300041988
- Category
- TRIM SET
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- BERKAH REFRAKTORI PRATAMA PT
- Lead time
- 153 d · P80 236 d
- Unit price
- Rp 26.2M
Recommendation
- 1.Forecast 1.4 SET/year: 1.4 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~153 days; expected demand during lead time 0.6.
- 3.A 96.3% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
- 4.On hand 2 + on order 0 is at or below the reorder point: order 2 now.
- 5.Long lead time: 80% of deliveries took up to 236 days and the fastest seen in its category 75 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
2 SET
Rp 52.4M · order by 01 Oct 2026
Expected arrival ≈ 153 days
Long-leadSingle source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
96.3%
stockout risk now 4%
Unit price
Rp 26.2M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 262 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 283.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~75 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_LCV-1289C LEVEL CONTROL VALVE | B | 1 | 1 | 0.55 |
Lead time and procurement
Lead time 153 ± 83 days (PO history + category, 2 PO lines) · on-time 43%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 05 Dec 2025 | PR03 Regular replenishment | 2 | Rp 25.9M | 14 Jun 2026 | 191 d |
| 09 Jun 2025 | PR06 Regular replenishment | 2 | Rp 26.5M | 15 Sept 2025 | 98 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 22 Jun 2025 | Medium | PX_LCV-1289C | LCV-1289C; valve hunting |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 12 Jan 2026 | 3 | 201000000139 | Corrective |
| 11 Jan 2026 | 1 | 201000000139 | Corrective |