BEARING,JOURNAL,DWG.367-4035,FOR KC-801

Material 4300042138 · BEARING · Plant 1000

ALong-leadReorderCriticalStockout
Material
4300042138
Category
BEARING
Base unit
SET
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
ANUGRAH PERKASA PERSADA PT
Lead time
102 d · P80 127 d
Unit price
Rp 101.4M

Recommendation

  • 1.Forecast 0.9 SET/year: 0.9 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~102 days; expected demand during lead time 0.3.
  • 3.A 97.1% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 2 now.
  • 5.Long lead time: 80% of deliveries took up to 127 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
2 SET
Rp 202.8M · order by 01 Oct 2026
Expected arrival ≈ 102 days
Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
97.1%
stockout risk now 23%
Unit price
Rp 101.4M
PO history
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 9 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 458.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-801
DEMIN WATER FAN
A121.43

Lead time and procurement

Lead time 102 ± 40 days (PO history + category, 1 PO lines) · on-time 50%

PR dateTypeQtyUnit priceDeliveryLead time
09 Nov 2025PR05
Project / turnaround
2Rp 101.4M09 Jul 2026242 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
12 Apr 2026EmergencyPX_KC-801KC-801 high vibration
12 Jul 2025LowPX_KC-801KC-801 bearing temp high

Recent goods issues

Posting dateQtyOrderOrder type
22 Sept 20261201000013925Corrective