BEARING,JOURNAL,DWG.554-5540,FOR KC-210D
Material 4300042365 · BEARING · Plant 1000
SReducePotentially obsolete
- Material
- 4300042365
- Category
- BEARING
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- S (0 of 1 FuncLocs A/B)
- Supplier
- PERMATA INSTRUMEN MAKMUR PT
- Lead time
- 94 d · P80 127 d
- Unit price
- Rp 498.7M
Recommendation
- 1.Forecast 0.0 SET/year: 0.0 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~94 days; expected demand during lead time 0.0.
- 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
- 4.Stock 39 exceeds the level to keep (0) by 39.
Single sourceOpen PO
On hand / on order
39 / 1
next delivery 03 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 498.7M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 49,191/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~23 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-210D ETHYLENE BLOWER | S | 1 | 0 | 0.57 |
Lead time and procurement
Lead time 94 ± 40 days (PO history + category, 1 PO lines) · on-time 40%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 07 Mar 2026 | PR05 Project / turnaround | 1 | Rp 498.7M | 03 Oct 2026 open | 210 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
Never issued in the 17-month history.