BEARING,THRUST PAD,DWG.986-8706,FOR KC-2
Material 4300044807 · BEARING · Plant 1000
BReduceNon-moving
- Material
- 4300044807
- Category
- BEARING
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 55 d · P80 127 d
- Unit price
- Rp 219.3M (est.)
Recommendation
- 1.Forecast 0.1 SET/year: 0.1 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~55 days; expected demand during lead time 0.0.
- 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
- 4.Stock 2 exceeds the level to keep (0) by 2.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 219.3M
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 13.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~23 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-225D INHIBITOR COMPRESSOR | B | 1 | 9 | 2.71 |
Lead time and procurement
Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 11 Sept 2026 | Low | PX_KC-225D | KC-225D lube oil filter DP high |
| 22 Aug 2026 | Low | PX_KC-225D | Install scaffolding at KC-225D |
| 27 Jul 2026 | Low | PX_KC-225D | Painting KC-225D |
| 20 Jun 2026 | Medium | PX_KC-225D | Inspect coupling KC-225D |
| 07 Jun 2026 | High | PX_KC-225D | KC-225D high vibration |
| 14 Mar 2026 | Medium | PX_KC-225D | Install scaffolding at KC-225D |
| 05 Mar 2026 | Low | PX_KC-225D | KC-225D lube oil filter DP high |
| 29 Dec 2025 | Low | PX_KC-225D | KC-225D high vibration |
| 20 May 2025 | Medium | PX_KC-225D | Overhaul |
Recent goods issues
Never issued in the 17-month history.