SEAT RING,VALVE,DWG.492-3062,FOR FCV-156
Material 4300044846 · SEAT RING · Plant 1000
CMonitorStockout
- Material
- 4300044846
- Category
- SEAT RING
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- SINAR SEJAHTERA LESTARI PT
- Lead time
- 130 d · P80 172 d
- Unit price
- Rp 18.3M
Recommendation
- 1.Forecast 0.2 EA/year: 0.2 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~130 days; expected demand during lead time 0.1.
- 3.A 93.3% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
Single sourceOpen PO
On hand / on order
0 / 2
next delivery 10 Dec 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
93.3%
stockout risk now 0%
Unit price
Rp 18.3M
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 310 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 5.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~65 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FCV-1562 CAUSTIC FLOW CONTROL | C | 1 | 1 | 0.11 |
Lead time and procurement
Lead time 130 ± 46 days (PO history, 3 PO lines) · on-time 33%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 02 Sept 2026 | PR03 Regular replenishment | 1 | Rp 17.9M | 25 Dec 2026 open | 114 d |
| 09 Jun 2026 | PR03 Regular replenishment | 1 | Rp 18.3M | 10 Dec 2026 open | 184 d |
| 14 Mar 2026 | PR05 Project / turnaround | 2 | Rp 18.8M | 14 Aug 2026 | 153 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 28 May 2025 | Low | PX_FCV-1562 | Overhaul FCV-1562 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 25 Nov 2025 | 1 | 201000029322 | Corrective |