SPRING,SAFETY VALVE,DWG.321-6873,FOR PRV
Material 4300044859 · SPRING · Plant 1000
ASafety-criticalLong-leadReorderNormalBelow reorder point
- Material
- 4300044859
- Category
- SPRING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 1 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- BERKAH REFRAKTORI PRATAMA PT
- Lead time
- 127 d · P80 196 d
- Unit price
- Rp 11.7M
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 1.4 EA/year: 1.4 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~127 days; expected demand during lead time 0.5.
- 4.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
- 5.On hand 1 + on order 1 is at or below the reorder point: order 3 now.
- 6.Long lead time: 80% of deliveries took up to 196 days and the fastest seen in its category 77 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 7.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
3 EA
Rp 35.0M · order by 01 Oct 2026
Expected arrival ≈ 127 days
Safety-critical (SCE)Long-leadSingle sourceOpen PO
On hand / on order
1 / 1
next delivery 26 Dec 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
99.8%
stockout risk now 1%
Unit price
Rp 11.7M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 52 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~77 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PRV-1591 SAFETY VALVE HE-779D | A | 1 | 2 | 0.47 |
Lead time and procurement
Lead time 127 ± 65 days (PO history + category, 2 PO lines) · on-time 43%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 16 Sept 2026 | PR03 Regular replenishment | 1 | Rp 11.6M | 26 Dec 2026 open | 101 d |
| 10 May 2025 | PR03 Regular replenishment | 2 | Rp 11.7M | 12 Sept 2025 | 125 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 06 Sept 2025 | Medium | PX_PRV-1591 | Leak from packing |
| 02 May 2025 | Medium | PX_PRV-1591 | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 10 Aug 2026 | 1 | 201000006061 | Corrective |
| 09 Aug 2026 | 1 | 201000006061 | Corrective |