SPRING,SAFETY VALVE,DWG.321-6873,FOR PRV

Material 4300044859 · SPRING · Plant 1000

ASafety-criticalLong-leadReorderNormalBelow reorder point
Material
4300044859
Category
SPRING
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
BERKAH REFRAKTORI PRATAMA PT
Lead time
127 d · P80 196 d
Unit price
Rp 11.7M

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 1.4 EA/year: 1.4 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~127 days; expected demand during lead time 0.5.
  • 4.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
  • 5.On hand 1 + on order 1 is at or below the reorder point: order 3 now.
  • 6.Long lead time: 80% of deliveries took up to 196 days and the fastest seen in its category 77 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 7.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
3 EA
Rp 35.0M · order by 01 Oct 2026
Expected arrival ≈ 127 days
Safety-critical (SCE)Long-leadSingle sourceOpen PO
On hand / on order
1 / 1
next delivery 26 Dec 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
99.8%
stockout risk now 1%
Unit price
Rp 11.7M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 52 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~77 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PRV-1591
SAFETY VALVE HE-779D
A120.47

Lead time and procurement

Lead time 127 ± 65 days (PO history + category, 2 PO lines) · on-time 43%

PR dateTypeQtyUnit priceDeliveryLead time
16 Sept 2026PR03
Regular replenishment
1Rp 11.6M26 Dec 2026
open
101 d
10 May 2025PR03
Regular replenishment
2Rp 11.7M12 Sept 2025125 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
06 Sept 2025MediumPX_PRV-1591Leak from packing
02 May 2025MediumPX_PRV-1591Replace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
10 Aug 20261201000006061Corrective
09 Aug 20261201000006061Corrective