RING,WEAR,DWG.745-9295,FOR PP-1869

Material 4300046137 · RING · Plant 1000

CMonitorSlow-moving
Material
4300046137
Category
RING
Base unit
EA
MRP type
Non Stock
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
CAHAYA TEKNIK PERSADA PT
Lead time
150 d · P80 143 d
Unit price
Rp 2.8M

Recommendation

  • 1.Forecast 0.3 EA/year: 0.3 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~150 days; expected demand during lead time 0.1.
  • 3.A 99.5% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
Single sourceOpen PO
On hand / on order
1 / 3
next delivery 26 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.5%
stockout risk now 0%
Unit price
Rp 2.8M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 6.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~59 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PY_PP-1869
C3 RECYCLE PUMP
C120.62

Lead time and procurement

Lead time 150 ± 40 days (PO history + category, 1 PO lines) · on-time 36%

PR dateTypeQtyUnit priceDeliveryLead time
07 Apr 2026PR03
Regular replenishment
1Rp 2.8M24 Feb 2027
open
323 d
25 Oct 2025PR06
Regular replenishment
2Rp 2.7M26 Oct 2026
open
366 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
05 Aug 2026MediumPY_PP-1869Install cover plate for MCP cracking
15 May 2025HighPY_PP-1869PP-1869 seal leak

Recent goods issues

Posting dateQtyOrderOrder type
17 May 20251204000001507Preventive