COUPLING,DWG.639-4437,FOR PP-1869
Material 4300046165 · COUPLING · Plant 1000
CReduceSlow-moving
- Material
- 4300046165
- Category
- COUPLING
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- MEGA ELEKTRIK ABADI PT
- Lead time
- 72 d · P80 139 d
- Unit price
- Rp 4.0M
Recommendation
- 1.Forecast 0.3 SET/year: 0.3 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~72 days; expected demand during lead time 0.1.
- 3.A 95.1% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
- 4.Stock 2 exceeds the level to keep (1) by 1.
Single source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
95.1%
stockout risk now 0%
Unit price
Rp 4.0M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 4.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~44 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PY_PP-1869 C3 RECYCLE PUMP | C | 1 | 2 | 0.62 |
Lead time and procurement
Lead time 72 ± 54 days (PO history + category, 2 PO lines) · on-time 58%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 05 Dec 2025 | PR03 Regular replenishment | 1 | Rp 4.1M | 17 Jan 2026 | 43 d |
| 11 Oct 2025 | PR03 Regular replenishment | 2 | Rp 3.9M | 11 Dec 2025 | 61 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 05 Aug 2026 | Medium | PY_PP-1869 | Install cover plate for MCP cracking |
| 15 May 2025 | High | PY_PP-1869 | PP-1869 seal leak |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 18 May 2025 | 1 | 201000014199 | Corrective |