SEAT RING,VALVE,DWG.665-2531,FOR LCV-669

Material 4300046433 · SEAT RING · Plant 1000

AReduceExcess
Material
4300046433
Category
SEAT RING
Base unit
EA
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
BERKAH REFRAKTORI PRATAMA PT
Lead time
110 d · P80 184 d
Unit price
Rp 9.4M

Recommendation

  • 1.Forecast 0.4 EA/year: 0.4 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~110 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.Stock 5 exceeds the level to keep (3) by 2.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Single sourceOpen POLead time estimated
On hand / on order
5 / 2
next delivery 26 Nov 2027
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 9.4M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 83 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 593.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~65 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_LCV-669
PP-1279 LEVEL CONTROL
A100.12

Lead time and procurement

Lead time 110 ± 58 days (Category estimate, 0 PO lines) · on-time 43%

PR dateTypeQtyUnit priceDeliveryLead time
10 Aug 2026PR01
Import / long-lead
2Rp 9.4M26 Nov 2027
open
473 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
10 Jul 20261201000016267Corrective