Sparely
DU

SPRING,SAFETY VALVE,DWG.541-5531,FOR PRV

Material 4300046520 · SPRING · Plant 1000

ASafety-criticalLong-leadReorderCriticalStockout
Material
4300046520
Category
SPRING
Base unit
EA
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
GUNUNG UTAMA LESTARI PT
Lead time
154 d · P80 234 d
Unit price
Rp 3.7M

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.6 EA/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~154 days; expected demand during lead time 0.3.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 4.
  • 5.On hand 0 + on order 1 is at or below the reorder point: order 3 now.
  • 6.Long lead time: 80% of deliveries took up to 234 days and the fastest seen in its category 77 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 7.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
3 EA
Rp 11.2M · order by 01 Oct 2026
Expected arrival ≈ 154 days
Safety-critical (SCE)Long-leadSingle sourceOpen PO
On hand / on order
0 / 1
next delivery 19 Mar 2027
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
4
order qty 1
Service level
100.0%
stockout risk now 3%
Unit price
Rp 3.7M
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 261 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 992.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~77 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PRV-302
SAFETY VALVE PP-1205A
A100.04

Lead time and procurement

Lead time 154 ± 92 days (PO history, 3 PO lines) · on-time 40%

PR dateTypeQtyUnit priceDeliveryLead time
17 May 2026PR04
Regular (other)
1Rp 3.7M19 Mar 2027
open
306 d
12 May 2026PR03
Regular replenishment
1Rp 3.9M15 Sept 2026126 d
16 Apr 2026PR06
Regular replenishment
1Rp 3.7M05 Jul 202680 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
13 Jan 20261201000005022Corrective
12 Jan 20261201000005022Corrective