THERMOWELL,DWG.392-8672,FOR TEL-847

Material 4300046982 · THERMOWELL · Plant 1000

CMonitorStockout
Material
4300046982
Category
THERMOWELL
Base unit
EA
MRP type
Non Stock
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
MEGA TEKNIK MAKMUR PT
Lead time
79 d · P80 84 d
Unit price
Rp 10.7M

Recommendation

  • 1.Forecast 0.1 EA/year: 0.1 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~79 days; expected demand during lead time 0.0.
  • 3.A 97.2% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
Single sourceOpen PO
On hand / on order
0 / 1
next delivery 24 Nov 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
97.2%
stockout risk now 0%
Unit price
Rp 10.7M
PO history
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 373 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~43 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TEL-847
TEMPERATURE
C100.01

Lead time and procurement

Lead time 79 ± 23 days (PO history, 3 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
11 Sept 2026PR10
Other
1Rp 10.7M24 Nov 2026
open
74 d
23 May 2026PR06
Regular replenishment
1Rp 10.0M13 Aug 202682 d
31 May 2025PR03
Regular replenishment
2Rp 10.8M24 Aug 202585 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
23 Sept 20251201000001522Corrective