SPRING,SAFETY VALVE,DWG.601-7012,FOR PRV

Material 4300047163 · SPRING · Plant 1000

SSafety-criticalLong-leadReorderCriticalStockout
Material
4300047163
Category
SPRING
Base unit
EA
MRP type
Non Stock
Criticality
S (0 of 1 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
SINAR SEJAHTERA LESTARI PT
Lead time
151 d · P80 196 d
Unit price
Rp 3.9M

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s) (equipment criticality S). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 1.0 EA/year: 1.0 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~151 days; expected demand during lead time 0.4.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 5 now.
  • 6.Long lead time: 80% of deliveries took up to 196 days and the fastest seen in its category 77 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
Proposed purchase requisition
5 EA
Rp 19.7M · order by 01 Oct 2026
Expected arrival ≈ 151 days
Safety-critical (SCE)Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
99.9%
stockout risk now 35%
Unit price
Rp 3.9M
PO history
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 2 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~77 days.

Installed on 1 functional locations

0 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PRV-718D
SAFETY VALVE KC-369B
S341.75

Lead time and procurement

Lead time 151 ± 65 days (PO history + category, 1 PO lines) · on-time 33%

PR dateTypeQtyUnit priceDeliveryLead time
25 Jan 2026PR06
Regular replenishment
1Rp 3.9M04 Aug 2026191 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
23 Sept 2026LowPX_PRV-718D[MSI-B-26-KCJ-360/M] Replace line
14 Sept 2026HighPX_PRV-718DReplace lamp as per PM finding
17 Jul 2026LowPX_PRV-718DPRV-718D simmering
13 Jun 2025MediumPX_PRV-718DLeak from packing

Recent goods issues

Posting dateQtyOrderOrder type
29 Sept 20261201000017495Corrective