Sparely
DU

RING,WEAR,DWG.316-8372,FOR PP-205B

Material 4300047433 · RING · Plant 1000

BLong-leadReduceNon-moving
Material
4300047433
Category
RING
Base unit
EA
MRP type
Non Stock
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
CAHAYA TEKNIK PERSADA PT
Lead time
85 d · P80 143 d
Unit price
Rp 12.1M

Recommendation

  • 1.Forecast 0.1 EA/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~85 days; expected demand during lead time 0.0.
  • 3.A 98.2% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Stock 14 exceeds the level to keep (1) by 13.
  • 5.Long lead time: 80% of deliveries took up to 143 days and the fastest seen in its category 59 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle source
On hand / on order
14 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
98.2%
stockout risk now 0%
Unit price
Rp 12.1M
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 24.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~59 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-205B
LEAN AMINE PUMP
B151.90

Lead time and procurement

Lead time 85 ± 40 days (PO history + category, 1 PO lines) · on-time 36%

PR dateTypeQtyUnit priceDeliveryLead time
27 Jun 2025PR06
Regular replenishment
2Rp 12.1M30 Aug 202564 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
23 Aug 2026MediumPX_PP-205BOil leak at PP-205B bearing housing
05 Dec 2025LowPX_PP-205BPP-205B seal leak
08 Oct 2025MediumPX_PP-205BReplace lamp as per PM finding
07 Oct 2025MediumPX_PP-205BReplace lamp as per PM finding
17 May 2025MediumPX_PP-205BOil leak at PP-205B bearing housing

Recent goods issues

Never issued in the 17-month history.