SLEEVE,SHAFT,DWG.833-4629,FOR PP-205B
Material 4300047468 · SLEEVE · Plant 1000
BLong-leadReduceSlow-moving
- Material
- 4300047468
- Category
- SLEEVE
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- CAHAYA TEKNIK PERSADA PT
- Lead time
- 154 d · P80 210 d
- Unit price
- Rp 5.8M
Recommendation
- 1.Forecast 1.3 EA/year: 1.3 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~154 days; expected demand during lead time 0.5.
- 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
- 4.Stock 7 exceeds the level to keep (6) by 1.
- 5.Long lead time: 80% of deliveries took up to 210 days and the fastest seen in its category 67 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle source
On hand / on order
7 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
99.7%
stockout risk now 0%
Unit price
Rp 5.8M
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 476 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 226.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~67 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-205B LEAN AMINE PUMP | B | 1 | 5 | 1.90 |
Lead time and procurement
Lead time 154 ± 55 days (PO history + category, 1 PO lines) · on-time 36%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 12 Dec 2025 | PR05 Project / turnaround | 2 | Rp 5.8M | 10 Jul 2026 | 210 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 23 Aug 2026 | Medium | PX_PP-205B | Oil leak at PP-205B bearing housing |
| 05 Dec 2025 | Low | PX_PP-205B | PP-205B seal leak |
| 08 Oct 2025 | Medium | PX_PP-205B | Replace lamp as per PM finding |
| 07 Oct 2025 | Medium | PX_PP-205B | Replace lamp as per PM finding |
| 17 May 2025 | Medium | PX_PP-205B | Oil leak at PP-205B bearing housing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 12 Jun 2025 | 2 | 201000010525 | Corrective |