TRIM SET,CONTROL VALVE,DWG.947-5211,FOR

Material 4300047637 · TRIM SET · Plant 1000

BLong-leadMonitorSlow-moving
Material
4300047637
Category
TRIM SET
Base unit
SET
MRP type
Stock Item
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
RAJAWALI SEJAHTERA ABADI PT
Lead time
120 d · P80 236 d
Unit price
Rp 227.5M

Recommendation

  • 1.Forecast 0.5 SET/year: 0.5 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~120 days; expected demand during lead time 0.2.
  • 3.A 92.1% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
  • 4.Long lead time: 80% of deliveries took up to 236 days and the fastest seen in its category 75 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
92.1%
stockout risk now 8%
Unit price
Rp 227.5M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 238 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 98.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~75 days.

Installed on 1 functional locations

1 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-1963B
BY PASS LINE
B400.11

Lead time and procurement

Lead time 120 ± 83 days (PO history + category, 2 PO lines) · on-time 36%

PR dateTypeQtyUnit priceDeliveryLead time
21 May 2026PR03
Regular replenishment
1Rp 228.9M17 Jul 202657 d
11 Jun 2025PR03
Regular replenishment
2Rp 226.0M18 Aug 202568 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
05 Feb 20262204000003218Preventive