Sparely
DU

TRAY VALVE,DWG.749-2086,FOR CL-721

Material 4300048261 · TRAY VALVE · Plant 1000

BReorderNormalSlow-moving
Material
4300048261
Category
TRAY VALVE
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
70 d · P80 104 d
Unit price
Rp 84,525 (est.)

Recommendation

  • 1.Forecast 0.7 EA/year: 0.7 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~70 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 2 now.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
2 EA
Rp 169,050 · order by 01 Oct 2026
Expected arrival ≈ 70 days
Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 1%
Unit price
Rp 84,525
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 346 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 119.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~30 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_CL-721
QUENCH OIL SCRUBBER
B162.09

Lead time and procurement

Lead time 70 ± 25 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
24 Jul 2026HighPX_CL-721CL-721 DP high
07 Feb 2026MediumPX_CL-721Install scaffolding at CL-721
15 Jan 2026LowPX_CL-721CL-721 DP high
28 Nov 2025HighPX_CL-721Inspect CL-721 internal
21 Oct 2025MediumPX_CL-721Leak from packing
17 May 2025MediumPX_CL-721Replace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
20 Oct 20251201000000280Corrective