RING,WEAR,DWG.695-4808,FOR PP-1106A

Material 4300049628 · RING · Plant 1000

CReorderHighStockout
Material
4300049628
Category
RING
Base unit
EA
MRP type
Non Stock
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
RAJAWALI TEKNIK PRATAMA PT
Lead time
99 d · P80 143 d
Unit price
Rp 18.9M

Recommendation

  • 1.Forecast 3.0 EA/year: 2.3 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
  • 2.Lead time ~99 days; expected demand during lead time 1.3 (incl. 0.7 planned).
  • 3.A 95.9% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 5 now.
Proposed purchase requisition
5 EA
Rp 94.4M · order by 01 Oct 2026
Expected arrival ≈ 99 days
Convert to Stock ItemSingle sourcePlanned demand in lead time
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 2
Rec. Max
5
order qty 2
Service level
95.9%
stockout risk now 100%
Unit price
Rp 18.9M
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 24 days ago, 4 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 29.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~59 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1106A
LUBE OIL PUMP
C162.33

Lead time and procurement

Lead time 99 ± 40 days (PO history + category, 1 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
14 May 2026PR03
Regular replenishment
2Rp 18.9M12 Sept 2026121 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Dec 2026PX_PP-1106APump overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
24 Sept 2026LowPX_PP-1106AReplace bearing PP-1106A
25 Aug 2026MediumPX_PP-1106APP-1106A high vibration
06 Aug 2026MediumPX_PP-1106AOverhaul PP-1106A
01 Aug 2026LowPX_PP-1106APP-1106A discharge pressure low
19 Jun 2026MediumPX_PP-1106APP-1106A seal leak
14 May 2025MediumPX_PP-1106APSM25/PP-1106A discharge pressure low

Recent goods issues

Posting dateQtyOrderOrder type
07 Sept 20262201000015787Corrective