RING,WEAR,DWG.695-4808,FOR PP-1106A
Material 4300049628 · RING · Plant 1000
CReorderHighStockout
- Material
- 4300049628
- Category
- RING
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- RAJAWALI TEKNIK PRATAMA PT
- Lead time
- 99 d · P80 143 d
- Unit price
- Rp 18.9M
Recommendation
- 1.Forecast 3.0 EA/year: 2.3 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
- 2.Lead time ~99 days; expected demand during lead time 1.3 (incl. 0.7 planned).
- 3.A 95.9% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 5 now.
Proposed purchase requisition
5 EA
Rp 94.4M · order by 01 Oct 2026
Expected arrival ≈ 99 days
Convert to Stock ItemSingle sourcePlanned demand in lead time
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 2
Rec. Max
5
order qty 2
Service level
95.9%
stockout risk now 100%
Unit price
Rp 18.9M
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 24 days ago, 4 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 29.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~59 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1106A LUBE OIL PUMP | C | 1 | 6 | 2.33 |
Lead time and procurement
Lead time 99 ± 40 days (PO history + category, 1 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 14 May 2026 | PR03 Regular replenishment | 2 | Rp 18.9M | 12 Sept 2026 | 121 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Dec 2026 | PX_PP-1106A | Pump overhaul | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 24 Sept 2026 | Low | PX_PP-1106A | Replace bearing PP-1106A |
| 25 Aug 2026 | Medium | PX_PP-1106A | PP-1106A high vibration |
| 06 Aug 2026 | Medium | PX_PP-1106A | Overhaul PP-1106A |
| 01 Aug 2026 | Low | PX_PP-1106A | PP-1106A discharge pressure low |
| 19 Jun 2026 | Medium | PX_PP-1106A | PP-1106A seal leak |
| 14 May 2025 | Medium | PX_PP-1106A | PSM25/PP-1106A discharge pressure low |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 07 Sept 2026 | 2 | 201000015787 | Corrective |