IMPELLER,DWG.382-5149,FOR PP-1106A
Material 4300049667 · IMPELLER · Plant 1000
CReduceExcess
- Material
- 4300049667
- Category
- IMPELLER
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 184 d · P80 276 d
- Unit price
- Rp 102.1M (est.)
Recommendation
- 1.Forecast 1.9 EA/year: 1.2 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
- 2.Lead time ~184 days; expected demand during lead time 1.3 (incl. 0.7 planned).
- 3.A 87.6% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
- 4.Stock 15 exceeds the level to keep (3) by 12.
Convert to Stock ItemPlanned demand in lead timePrice estimatedLead time estimated
On hand / on order
15 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 1
Rec. Max
3
order qty 1
Service level
87.6%
stockout risk now 0%
Unit price
Rp 102.1M
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 4 days ago, 4 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 52.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~105 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1106A LUBE OIL PUMP | C | 1 | 6 | 2.33 |
Lead time and procurement
Lead time 184 ± 88 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Dec 2026 | PX_PP-1106A | Pump overhaul | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 24 Sept 2026 | Low | PX_PP-1106A | Replace bearing PP-1106A |
| 25 Aug 2026 | Medium | PX_PP-1106A | PP-1106A high vibration |
| 06 Aug 2026 | Medium | PX_PP-1106A | Overhaul PP-1106A |
| 01 Aug 2026 | Low | PX_PP-1106A | PP-1106A discharge pressure low |
| 19 Jun 2026 | Medium | PX_PP-1106A | PP-1106A seal leak |
| 14 May 2025 | Medium | PX_PP-1106A | PSM25/PP-1106A discharge pressure low |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 27 Sept 2026 | 1 | 201000010887 | Corrective |