NOZZLE,SAFETY VALVE,DWG.373-3967,FOR PRV
Material 4300049989 · NOZZLE · Plant 1000
SSafety-criticalLong-leadReorderCriticalInsurance gap
- Material
- 4300049989
- Category
- NOZZLE
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- S (0 of 1 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- KARYA ENERGI SENTOSA PT
- Lead time
- 113 d · P80 177 d
- Unit price
- Rp 18.1M
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s) (equipment criticality S). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
- 3.Lead time ~113 days; expected demand during lead time 0.0.
- 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
- 5.On hand 0 + on order 0 is at or below the reorder point: order 1 now.
- 6.Long lead time: 80% of deliveries took up to 177 days and the fastest seen in its category 69 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
Proposed purchase requisition
1 EA
Rp 18.1M · order by 01 Oct 2026
Expected arrival ≈ 113 days
Safety-critical (SCE)Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
99.9%
stockout risk now 0%
Unit price
Rp 18.1M
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~69 days.
Installed on 1 functional locations
0 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PRV-822C SAFETY VALVE HE-895C | S | 4 | 0 | 0.04 |
Lead time and procurement
Lead time 113 ± 50 days (PO history + category, 1 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 16 Jul 2025 | PR06 Regular replenishment | 2 | Rp 18.1M | 13 Oct 2025 | 89 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
Never issued in the 17-month history.