SLEEVE,SHAFT,DWG.729-5817,FOR PP-392A
Material 4300050074 · SLEEVE · Plant 1000
CMaintainPotentially obsolete
- Material
- 4300050074
- Category
- SLEEVE
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 135 d · P80 210 d
- Unit price
- Rp 8.1M (est.)
Recommendation
- 1.Forecast 0.1 EA/year: 0.1 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~135 days; expected demand during lead time 0.0.
- 3.A 97.8% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
97.8%
stockout risk now 0%
Unit price
Rp 8.1M
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~67 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-392A CHARGE GAS PUMP | C | 1 | 5 | 1.47 |
Lead time and procurement
Lead time 135 ± 55 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 03 Sept 2026 | Medium | PX_PP-392A | [MSI-B-26-XPH-229/M] Replace line |
| 12 Jul 2026 | Medium | PX_PP-392A | Leak from packing |
| 06 May 2026 | Low | PX_PP-392A | Install cover plate for MCP cracking |
| 25 Aug 2025 | Medium | PX_PP-392A | Install scaffolding at PP-392A |
| 11 Jul 2025 | Medium | PX_PP-392A | Install scaffolding at PP-392A |
Recent goods issues
Never issued in the 17-month history.