BEARING,JOURNAL,DWG.707-9312,FOR KC-452

Material 4300050758 · BEARING · Plant 1000

ALong-leadMonitorInsurance gap
Material
4300050758
Category
BEARING
Base unit
SET
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
DUTA SEJAHTERA ABADI PT
Lead time
73 d · P80 127 d
Unit price
Rp 112.9M

Recommendation

  • 1.Forecast 0.1 SET/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~73 days; expected demand during lead time 0.0.
  • 3.A 97.8% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.Long lead time: 80% of deliveries took up to 127 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Insurance spare candidateLong-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
97.8%
stockout risk now 2%
Unit price
Rp 112.9M
PO history
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 54.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-452
HYDROGEN FAN
A162.71

Lead time and procurement

Lead time 73 ± 40 days (PO history + category, 1 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
10 Feb 2026PR06
Regular replenishment
2Rp 112.9M15 Jun 2026125 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
05 Sept 2026MediumPX_KC-452Overhaul
05 Sept 2026MediumPX_KC-452Inspect coupling KC-452
20 Jan 2026MediumPX_KC-452Replace lamp as per PM finding
17 Oct 2025LowPX_KC-452KC-452 bearing temp high
04 Sept 2025LowPX_KC-452Inspect coupling KC-452
04 May 2025LowPX_KC-452KC-452 high vibration

Recent goods issues

Never issued in the 17-month history.