Sparely
DU

RING,WEAR,DWG.907-6913,FOR PP-244A

Material 4300051276 · RING · Plant 1000

CMonitorInsurance gap
Material
4300051276
Category
RING
Base unit
EA
MRP type
Non Stock
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
92 d · P80 143 d
Unit price
Rp 8.2M (est.)

Recommendation

  • 1.Forecast 0.1 EA/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~92 days; expected demand during lead time 0.0.
  • 3.A 97.6% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
97.6%
stockout risk now 2%
Unit price
Rp 8.2M
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~59 days.

Installed on 1 functional locations

0 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-244A
LEAN AMINE PUMP
C272.33

Lead time and procurement

Lead time 92 ± 40 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
16 Sept 2026MediumPX_PP-244AOil leak at PP-244A bearing housing
19 Apr 2026LowPX_PP-244AReplace lamp as per PM finding
25 Jan 2026MediumPX_PP-244AOverhaul PP-244A
09 Dec 2025HighPX_PP-244AReplace lamp as per PM finding
18 Sept 2025MediumPX_PP-244AOil leak at PP-244A bearing housing
04 Sept 2025MediumPX_PP-244AInstall scaffolding at PP-244A
31 May 2025MediumPX_PP-244AOverhaul PP-244A

Recent goods issues

Never issued in the 17-month history.