COUPLING,DWG.237-7110,FOR PP-244A
Material 4300051311 · COUPLING · Plant 1000
CReorderHighStockout
- Material
- 4300051311
- Category
- COUPLING
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 86 d · P80 139 d
- Unit price
- Rp 8.6M (est.)
Recommendation
- 1.Forecast 1.9 SET/year: 1.9 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~86 days; expected demand during lead time 0.5.
- 3.A 97.8% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 4 now.
Proposed purchase requisition
4 SET
Rp 34.2M · order by 01 Oct 2026
Expected arrival ≈ 86 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
97.8%
stockout risk now 20%
Unit price
Rp 8.6M
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 154 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 18.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~44 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-244A LEAN AMINE PUMP | C | 1 | 7 | 2.33 |
Lead time and procurement
Lead time 86 ± 54 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 16 Sept 2026 | Medium | PX_PP-244A | Oil leak at PP-244A bearing housing |
| 19 Apr 2026 | Low | PX_PP-244A | Replace lamp as per PM finding |
| 25 Jan 2026 | Medium | PX_PP-244A | Overhaul PP-244A |
| 09 Dec 2025 | High | PX_PP-244A | Replace lamp as per PM finding |
| 18 Sept 2025 | Medium | PX_PP-244A | Oil leak at PP-244A bearing housing |
| 04 Sept 2025 | Medium | PX_PP-244A | Install scaffolding at PP-244A |
| 31 May 2025 | Medium | PX_PP-244A | Overhaul PP-244A |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 30 Apr 2026 | 2 | 201000024601 | Corrective |