Sparely
DU

COUPLING,DWG.237-7110,FOR PP-244A

Material 4300051311 · COUPLING · Plant 1000

CReorderHighStockout
Material
4300051311
Category
COUPLING
Base unit
SET
MRP type
Non Stock
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
86 d · P80 139 d
Unit price
Rp 8.6M (est.)

Recommendation

  • 1.Forecast 1.9 SET/year: 1.9 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~86 days; expected demand during lead time 0.5.
  • 3.A 97.8% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 4 now.
Proposed purchase requisition
4 SET
Rp 34.2M · order by 01 Oct 2026
Expected arrival ≈ 86 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
97.8%
stockout risk now 20%
Unit price
Rp 8.6M
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 154 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 18.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~44 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-244A
LEAN AMINE PUMP
C172.33

Lead time and procurement

Lead time 86 ± 54 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
16 Sept 2026MediumPX_PP-244AOil leak at PP-244A bearing housing
19 Apr 2026LowPX_PP-244AReplace lamp as per PM finding
25 Jan 2026MediumPX_PP-244AOverhaul PP-244A
09 Dec 2025HighPX_PP-244AReplace lamp as per PM finding
18 Sept 2025MediumPX_PP-244AOil leak at PP-244A bearing housing
04 Sept 2025MediumPX_PP-244AInstall scaffolding at PP-244A
31 May 2025MediumPX_PP-244AOverhaul PP-244A

Recent goods issues

Posting dateQtyOrderOrder type
30 Apr 20262201000024601Corrective