Sparely
DU

DISC,SAFETY VALVE,DWG.688-6451,FOR PRV-7

Material 4300051941 · DISC · Plant 1000

SSafety-criticalLong-leadReorderCriticalStockout
Material
4300051941
Category
DISC
Base unit
EA
MRP type
Non Stock
Criticality
S (0 of 1 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
KARYA ENERGI SENTOSA PT
Lead time
87 d · P80 171 d
Unit price
Rp 12.5M

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s) (equipment criticality S). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.1 EA/year: 0.1 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~87 days; expected demand during lead time 0.0.
  • 4.A 97.9% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 1 now.
  • 6.Long lead time: 80% of deliveries took up to 171 days and the fastest seen in its category 44 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
Proposed purchase requisition
1 EA
Rp 12.5M · order by 01 Oct 2026
Expected arrival ≈ 87 days
Safety-critical (SCE)Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
97.9%
stockout risk now 2%
Unit price
Rp 12.5M
PO history
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 82.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PRV-730A
SAFETY VALVE CL-1224
S100.04

Lead time and procurement

Lead time 87 ± 64 days (PO history + category, 1 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
10 Mar 2026PR06
Regular replenishment
1Rp 12.5M31 May 202682 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
12 May 20251204000039962Preventive