TRIM SET,CONTROL VALVE,DWG.446-3534,FOR
Material 4300052029 · TRIM SET · Plant 1000
ALong-leadReduceExcess
- Material
- 4300052029
- Category
- TRIM SET
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- MEGA TEKNIK MAKMUR PT
- Lead time
- 153 d · P80 236 d
- Unit price
- Rp 86.4M
Recommendation
- 1.Forecast 1.0 SET/year: 1.0 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~153 days; expected demand during lead time 0.4.
- 3.A 99.1% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
- 4.Stock 75 exceeds the level to keep (3) by 72.
- 5.Long lead time: 80% of deliveries took up to 236 days and the fastest seen in its category 75 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadConvert to Stock ItemSingle sourceOpen PO
On hand / on order
75 / 2
next delivery 14 Nov 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
99.1%
stockout risk now 0%
Unit price
Rp 86.4M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 12 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~75 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FCV-1863 BY PASS LINE | A | 1 | 0 | 0.11 |
Lead time and procurement
Lead time 153 ± 83 days (PO history + category, 2 PO lines) · on-time 42%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 14 Aug 2026 | PR01 Import / long-lead | 1 | Rp 86.4M | 16 Apr 2028 open | 611 d |
| 26 May 2026 | PR05 Project / turnaround | 1 | Rp 85.7M | 14 Nov 2026 open | 172 d |
| 18 Aug 2025 | PR06 Regular replenishment | 1 | Rp 87.2M | 10 Dec 2025 | 114 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 19 Sept 2026 | 1 | 201000013046 | Corrective |
| 24 Sept 2025 | 1 | 201000026626 | Corrective |