POSITIONER,VALVE,DWG.339-7612,FOR FCV-11

Material 4300052195 · POSITIONER · Plant 1000

BReorderCriticalStockout
Material
4300052195
Category
POSITIONER
Base unit
EA
MRP type
Non Stock
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
SINAR SEJAHTERA LESTARI PT
Lead time
78 d · P80 82 d
Unit price
Rp 32.6M

Recommendation

  • 1.Forecast 0.4 EA/year: 0.4 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~78 days; expected demand during lead time 0.1.
  • 3.A 92.8% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 1 now.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
1 EA
Rp 32.6M · order by 01 Oct 2026
Expected arrival ≈ 78 days
Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
92.8%
stockout risk now 7%
Unit price
Rp 32.6M
PO history
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 263 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 75.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~40 days.

Installed on 1 functional locations

1 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-1130B
HYDROGEN FLOW CONTROL
B410.54

Lead time and procurement

Lead time 78 ± 49 days (PO history, 3 PO lines) · on-time 33%

PR dateTypeQtyUnit priceDeliveryLead time
28 Apr 2026PR06
Regular replenishment
1Rp 32.0M01 Aug 202695 d
21 Dec 2025PR04
Regular (other)
1Rp 32.6M21 Feb 202662 d
07 Oct 2025PR06
Regular replenishment
2Rp 32.8M03 Nov 202527 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
18 Aug 2025MediumPX_FCV-1130BFCV-1130B; small leak at packing

Recent goods issues

Posting dateQtyOrderOrder type
11 Jan 20261201000022139Corrective