TRAY VALVE,DWG.828-4389,FOR CL-1871
Material 4300052269 · TRAY VALVE · Plant 1000
BMonitorSlow-moving
- Material
- 4300052269
- Category
- TRAY VALVE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 70 d · P80 104 d
- Unit price
- Rp 84,525 (est.)
Recommendation
- 1.Forecast 0.7 EA/year: 0.7 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~70 days; expected demand during lead time 0.1.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
- 4.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
3 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 84,525
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 404 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 115.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~30 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_CL-1871 CHARGE GAS SCRUBBER | B | 1 | 6 | 2.09 |
Lead time and procurement
Lead time 70 ± 25 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 12 Jun 2026 | Medium | PX_CL-1871 | Leak from packing |
| 11 Jun 2026 | Medium | PX_CL-1871 | Replace lamp as per PM finding |
| 13 May 2026 | Medium | PX_CL-1871 | Install scaffolding at CL-1871 |
| 10 Sept 2025 | Medium | PX_CL-1871 | Inspect CL-1871 internal |
| 05 Aug 2025 | Low | PX_CL-1871 | CL-1871 DP high |
| 05 Aug 2025 | Medium | PX_CL-1871 | Install scaffolding at CL-1871 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 23 Aug 2025 | 1 | 201000034053 | Corrective |