THERMOWELL,DWG.800-1331,FOR TEL-1793
Material 4300052598 · THERMOWELL · Plant 1000
ALong-leadReduceSlow-moving
- Material
- 4300052598
- Category
- THERMOWELL
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- KARYA ENERGI SENTOSA PT
- Lead time
- 131 d · P80 237 d
- Unit price
- Rp 6.2M
Recommendation
- 1.Forecast 0.4 EA/year: 0.4 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~131 days; expected demand during lead time 0.2.
- 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
- 4.Stock 87 exceeds the level to keep (4) by 83.
- 5.Long lead time: 80% of deliveries took up to 237 days and the fastest seen in its category 43 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
87 / 3
next delivery 19 Nov 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
99.7%
stockout risk now 0%
Unit price
Rp 6.2M
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 241 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 198.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~43 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TEL-1793 TEMPERATURE | A | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 131 ± 63 days (PO history, 3 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 22 Aug 2026 | PR06 Regular replenishment | 1 | Rp 6.2M | 19 Nov 2026 open | 89 d |
| 25 May 2026 | PR06 Regular replenishment | 2 | Rp 6.1M | 16 Dec 2026 open | 205 d |
| 15 Jun 2025 | PR06 Regular replenishment | 2 | Rp 6.3M | 01 Mar 2026 | 259 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 02 Feb 2026 | 2 | 201000033759 | Corrective |