Sparely
DU

THERMOWELL,DWG.800-1331,FOR TEL-1793

Material 4300052598 · THERMOWELL · Plant 1000

ALong-leadReduceSlow-moving
Material
4300052598
Category
THERMOWELL
Base unit
EA
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
KARYA ENERGI SENTOSA PT
Lead time
131 d · P80 237 d
Unit price
Rp 6.2M

Recommendation

  • 1.Forecast 0.4 EA/year: 0.4 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~131 days; expected demand during lead time 0.2.
  • 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
  • 4.Stock 87 exceeds the level to keep (4) by 83.
  • 5.Long lead time: 80% of deliveries took up to 237 days and the fastest seen in its category 43 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
87 / 3
next delivery 19 Nov 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
99.7%
stockout risk now 0%
Unit price
Rp 6.2M
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 241 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 198.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~43 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TEL-1793
TEMPERATURE
A100.01

Lead time and procurement

Lead time 131 ± 63 days (PO history, 3 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
22 Aug 2026PR06
Regular replenishment
1Rp 6.2M19 Nov 2026
open
89 d
25 May 2026PR06
Regular replenishment
2Rp 6.1M16 Dec 2026
open
205 d
15 Jun 2025PR06
Regular replenishment
2Rp 6.3M01 Mar 2026259 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
02 Feb 20262201000033759Corrective