COUPLING,DWG.946-7532,FOR KC-669
Material 4300052795 · COUPLING · Plant 1000
ALong-leadReorderCriticalStockout
- Material
- 4300052795
- Category
- COUPLING
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- RAJAWALI PERKASA JAYA PT
- Lead time
- 81 d · P80 139 d
- Unit price
- Rp 19.8M
Recommendation
- 1.Forecast 0.4 SET/year: 0.4 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~81 days; expected demand during lead time 0.1.
- 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 2 now.
- 5.Long lead time: 80% of deliveries took up to 139 days and the fastest seen in its category 44 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
2 SET
Rp 39.6M · order by 01 Oct 2026
Expected arrival ≈ 81 days
Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.7%
stockout risk now 8%
Unit price
Rp 19.8M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 261 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 336.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-669 DEMIN WATER BLOWER | A | 1 | 0 | 0.57 |
Lead time and procurement
Lead time 81 ± 54 days (PO history + category, 1 PO lines) · on-time 15%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 09 Feb 2026 | PR03 Regular replenishment | 2 | Rp 19.8M | 17 Apr 2026 | 67 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 13 Jan 2026 | 1 | 201000001132 | Corrective |