POSITIONER,VALVE,DWG.317-5830,FOR FCV-10

Material 4300053061 · POSITIONER · Plant 1000

BLong-leadReduceNon-moving
Material
4300053061
Category
POSITIONER
Base unit
EA
MRP type
Non Stock
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
KARYA ENERGI SENTOSA PT
Lead time
89 d · P80 100 d
Unit price
Rp 37.8M

Recommendation

  • 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~89 days; expected demand during lead time 0.0.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
  • 4.Stock 1 exceeds the level to keep (0) by 1.
  • 5.Long lead time: 80% of deliveries took up to 100 days and the fastest seen in its category 40 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle source
On hand / on order
1 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 37.8M
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 946,588/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~40 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-1021
DEMIN WATER FLOW CONTROL
B100.11

Lead time and procurement

Lead time 89 ± 48 days (PO history, 3 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
07 Oct 2025PR06
Regular replenishment
1Rp 37.8M01 Feb 2026117 d
10 Aug 2025PR06
Regular replenishment
1Rp 37.0M23 Oct 202574 d
30 Jun 2025PR06
Regular replenishment
1Rp 38.1M24 Aug 202555 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Never issued in the 17-month history.