IMPELLER,DWG.257-2714,FOR PP-1434

Material 4300053100 · IMPELLER · Plant 1000

BLong-leadReduceNon-moving
Material
4300053100
Category
IMPELLER
Base unit
EA
MRP type
Non Stock
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
DUTA ENERGI ABADI PT
Lead time
198 d · P80 276 d
Unit price
Rp 43.1M

Recommendation

  • 1.Forecast 0.1 EA/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~198 days; expected demand during lead time 0.0.
  • 3.A 95.9% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Stock 15 exceeds the level to keep (1) by 14.
  • 5.Long lead time: 80% of deliveries took up to 276 days and the fastest seen in its category 105 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle source
On hand / on order
15 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
95.9%
stockout risk now 0%
Unit price
Rp 43.1M
PO history
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 43.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~105 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1434
SPENT CAUSTIC PUMP
B141.90

Lead time and procurement

Lead time 198 ± 88 days (PO history + category, 2 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
18 Dec 2025PR03
Regular replenishment
1Rp 43.5M13 Jul 2026207 d
02 Oct 2025PR03
Regular replenishment
1Rp 42.7M21 May 2026231 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
01 Sept 2026LowPX_PP-1434PP-1434 discharge pressure low
23 Aug 2026MediumPX_PP-1434PP-1434 abnormal noise
14 Aug 2026MediumPX_PP-1434Replace lamp as per PM finding
09 Jul 2025HighPX_PP-1434PP-1434 seal leak

Recent goods issues

Never issued in the 17-month history.