COUPLING,DWG.995-8673,FOR KC-513
Material 4300054483 · COUPLING · Plant 1000
SMaintainNo stock needed
- Material
- 4300054483
- Category
- COUPLING
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- S (0 of 1 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 86 d · P80 139 d
- Unit price
- Rp 8.6M (est.)
Recommendation
- 1.Forecast 0.2 SET/year: 0.2 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~86 days; expected demand during lead time 0.0.
- 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 4%
Unit price
Rp 8.6M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 5 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 481,860/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~44 days.
Installed on 1 functional locations
0 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-513 WASH WATER BLOWER | S | 2 | 10 | 4.42 |
Lead time and procurement
Lead time 86 ± 54 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 23 Sept 2026 | Medium | PX_KC-513 | KC-513 high vibration |
| 07 Sept 2026 | Medium | PX_KC-513 | Inspect coupling KC-513 |
| 05 Sept 2026 | Low | PX_KC-513 | Inspect coupling KC-513 |
| 30 Aug 2026 | Medium | PX_KC-513 | KC-513 high vibration |
| 12 Jul 2026 | Medium | PX_KC-513 | Inspect coupling KC-513 |
| 20 Jun 2026 | Medium | PX_KC-513 | KC-513 bearing temp high |
| 11 May 2026 | Medium | PX_KC-513 | Leak from packing |
| 22 Nov 2025 | Medium | PX_KC-513 | Leak from packing |
| 15 Sept 2025 | Medium | PX_KC-513 | KC-513 bearing temp high |
| 26 Jun 2025 | Medium | PX_KC-513 | Install scaffolding at KC-513 |
Recent goods issues
Never issued in the 17-month history.