TRIM SET,CONTROL VALVE,DWG.160-4929,FOR

Material 4300054566 · TRIM SET · Plant 1000

ALong-leadMaintainHealthy
Material
4300054566
Category
TRIM SET
Base unit
SET
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
SINAR SEJAHTERA LESTARI PT
Lead time
179 d · P80 227 d
Unit price
Rp 21.1M

Recommendation

  • 1.Forecast 1.3 SET/year: 0.6 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
  • 2.Lead time ~179 days; expected demand during lead time 1.0 (incl. 0.7 planned).
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 5.
  • 4.Long lead time: 80% of deliveries took up to 227 days and the fastest seen in its category 75 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen POPlanned demand in lead time
On hand / on order
3 / 2
next delivery 06 Dec 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
5
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 21.1M
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 6 days ago, 0 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 880.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~75 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PCV-1274
PRESSURE CONTROL VALVE
A110.08

Lead time and procurement

Lead time 179 ± 68 days (PO history, 3 PO lines) · on-time 33%

PR dateTypeQtyUnit priceDeliveryLead time
22 Mar 2026PR03
Regular replenishment
2Rp 21.4M06 Dec 2026
open
259 d
03 Aug 2025PR03
Regular replenishment
1Rp 21.1M29 Jan 2026179 d
03 Jul 2025PR04
Regular (other)
1Rp 20.2M09 Dec 2025159 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Dec 2026PX_PCV-1274Final Element Overhaul; Control Valve0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
09 Jun 2025LowPX_PCV-1274Install scaffolding at PCV-1274

Recent goods issues

Posting dateQtyOrderOrder type
25 Sept 20261201000013974Corrective