SPRING,SAFETY VALVE,DWG.572-9237,FOR PRV

Material 4300055663 · SPRING · Plant 1000

CSafety-criticalLong-leadReorderCriticalStockout
Material
4300055663
Category
SPRING
Base unit
EA
MRP type
Non Stock
Criticality
C (0 of 1 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
GUNUNG UTAMA LESTARI PT
Lead time
149 d · P80 196 d
Unit price
Rp 6.4M

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s) (equipment criticality C). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.8 EA/year: 0.8 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~149 days; expected demand during lead time 0.3.
  • 4.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 5 now.
  • 6.Long lead time: 80% of deliveries took up to 196 days and the fastest seen in its category 77 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
Proposed purchase requisition
5 EA
Rp 31.9M · order by 01 Oct 2026
Expected arrival ≈ 149 days
Safety-critical (SCE)Long-leadConvert to Stock ItemSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
99.8%
stockout risk now 21%
Unit price
Rp 6.4M
PO history
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 162 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 930.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~77 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PRV-973C
SAFETY VALVE VD-679
C110.04

Lead time and procurement

Lead time 149 ± 65 days (PO history + category, 1 PO lines) · on-time 40%

PR dateTypeQtyUnit priceDeliveryLead time
27 Jan 2026PR03
Regular replenishment
2Rp 6.4M29 Jul 2026183 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
09 May 2025LowPX_PRV-973CPSM25/PRV-973C simmering

Recent goods issues

Posting dateQtyOrderOrder type
22 Apr 20261201000035868Corrective
24 May 20252201000021460Corrective