SEAT RING,VALVE,DWG.799-9826,FOR FCV-723

Material 4300055768 · SEAT RING · Plant 1000

ALong-leadReduceExcess
Material
4300055768
Category
SEAT RING
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
SINAR INSTRUMEN NUSANTARA PT
Lead time
117 d · P80 184 d
Unit price
Rp 30.3M

Recommendation

  • 1.Forecast 0.8 EA/year: 0.8 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~117 days; expected demand during lead time 0.3.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.Stock 7 exceeds the level to keep (3) by 4.
  • 5.Long lead time: 80% of deliveries took up to 184 days and the fastest seen in its category 65 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle source
On hand / on order
7 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
99.8%
stockout risk now 0%
Unit price
Rp 30.3M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 180 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~65 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-723
C3 RECYCLE FLOW CONTROL
A120.54

Lead time and procurement

Lead time 117 ± 58 days (PO history + category, 2 PO lines) · on-time 31%

PR dateTypeQtyUnit priceDeliveryLead time
17 Mar 2026PR06
Regular replenishment
2Rp 30.2M23 Jul 2026128 d
03 Sept 2025PR06
Regular replenishment
2Rp 30.3M06 Jan 2026125 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
07 Sept 2026LowPX_FCV-723[MSI-B-26-SFU-129/M] Replace line
30 May 2025LowPX_FCV-723Overhaul FCV-723

Recent goods issues

Posting dateQtyOrderOrder type
04 Apr 20261205000024821Other maintenance
03 Jan 20261201000005189Corrective