IMPELLER,DWG.811-4293,FOR PP-200A

Material 4300055969 · IMPELLER · Plant 1000

ALong-leadMaintainStockout
Material
4300055969
Category
IMPELLER
Base unit
EA
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
DUTA ENERGI ABADI PT
Lead time
213 d · P80 276 d
Unit price
Rp 45.1M

Recommendation

  • 1.Forecast 0.7 EA/year: 0.0 unplanned (installed-base failure prior (no history)) + 0.7 from the maintenance plan.
  • 2.Lead time ~213 days; expected demand during lead time 0.0.
  • 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Long lead time: 80% of deliveries took up to 276 days and the fastest seen in its category 105 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadConvert to Stock ItemSingle sourceOpen PO
On hand / on order
0 / 4
next delivery 12 Nov 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
99.6%
stockout risk now 0%
Unit price
Rp 45.1M
PO history
ML early warning: 12% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 17.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~105 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-200A
LEAN AMINE PUMP
A100.19

Lead time and procurement

Lead time 213 ± 88 days (PO history + category, 2 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
11 Jul 2026PR05
Project / turnaround
2Rp 44.6M12 Jun 2027
open
336 d
19 May 2026PR06
Regular replenishment
2Rp 45.6M12 Nov 2026
open
177 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
02 Jul 2027PX_PP-200APump overhaul0.72

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Never issued in the 17-month history.