BEARING,JOURNAL,DWG.770-4901,FOR KC-588
Material 4300056195 · BEARING · Plant 1000
ALong-leadMonitorSlow-moving
- Material
- 4300056195
- Category
- BEARING
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- RAJAWALI REFRAKTORI PRATAMA PT
- Lead time
- 136 d · P80 277 d
- Unit price
- Rp 235.3M
Recommendation
- 1.Forecast 1.0 SET/year: 1.0 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~136 days; expected demand during lead time 0.4.
- 3.A 82.4% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
- 4.Long lead time: 80% of deliveries took up to 277 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
1 / 2
next delivery 19 Oct 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
82.4%
stockout risk now 2%
Unit price
Rp 235.3M
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 219 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 255.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-588 CAUSTIC FAN | A | 1 | 2 | 1.00 |
Lead time and procurement
Lead time 136 ± 81 days (PO history, 3 PO lines) · on-time 37%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 28 Oct 2025 | PR05 Project / turnaround | 2 | Rp 247.7M | 19 Oct 2026 open | 356 d |
| 20 Aug 2025 | PR03 Regular replenishment | 2 | Rp 235.3M | 01 Jan 2026 | 134 d |
| 31 Jul 2025 | PR03 Regular replenishment | 1 | Rp 227.9M | 06 Jan 2026 | 159 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 22 Feb 2026 | Medium | PX_KC-588 | KC-588 lube oil filter DP high |
| 24 May 2025 | Medium | PX_KC-588 | Repair insulation KC-588 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 24 Feb 2026 | 2 | 201000021496 | Corrective |