TRAY VALVE,DWG.230-6339,FOR CL-962
Material 4300056427 · TRAY VALVE · Plant 1000
AReduceNon-moving
- Material
- 4300056427
- Category
- TRAY VALVE
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 70 d · P80 104 d
- Unit price
- Rp 84,525 (est.)
Recommendation
- 1.Forecast 0.1 EA/year: 0.1 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~70 days; expected demand during lead time 0.0.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.Stock 5 exceeds the level to keep (2) by 3.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
5 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 84,525
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 88.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~30 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_CL-962 PROPYLENE SCRUBBER | A | 1 | 8 | 3.38 |
Lead time and procurement
Lead time 70 ± 25 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 15 Jul 2026 | Medium | PX_CL-962 | Replace lamp as per PM finding |
| 23 Apr 2026 | Low | PX_CL-962 | Inspect CL-962 internal |
| 27 Feb 2026 | Medium | PX_CL-962 | CL-962 DP high |
| 19 Dec 2025 | Medium | PX_CL-962 | Repair insulation CL-962 |
| 10 Dec 2025 | Medium | PX_CL-962 | Install scaffolding at CL-962 |
| 25 Oct 2025 | Medium | PX_CL-962 | Replace lamp as per PM finding |
| 26 Aug 2025 | Medium | PX_CL-962 | Replace lamp as per PM finding |
| 10 Aug 2025 | Low | PX_CL-962 | Install cover plate for MCP cracking |
Recent goods issues
Never issued in the 17-month history.