Sparely
DU

SLEEVE,SHAFT,DWG.810-1359,FOR PP-254A

Material 4300056488 · SLEEVE · Plant 1000

CMonitorSlow-moving
Material
4300056488
Category
SLEEVE
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
RAJAWALI PERKASA JAYA PT
Lead time
191 d · P80 297 d
Unit price
Rp 8.1M

Recommendation

  • 1.Forecast 0.7 EA/year: 0.7 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~191 days; expected demand during lead time 0.4.
  • 3.A 83.0% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
Single sourceOpen PO
On hand / on order
2 / 2
next delivery 25 Jan 2027
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
83.0%
stockout risk now 0%
Unit price
Rp 8.1M
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 287 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 10.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~67 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-254A
SPENT CAUSTIC PUMP
C120.62

Lead time and procurement

Lead time 191 ± 71 days (PO history, 3 PO lines) · on-time 15%

PR dateTypeQtyUnit priceDeliveryLead time
07 Jun 2026PR03
Regular replenishment
2Rp 8.1M25 Jan 2027
open
232 d
04 Mar 2026PR03
Regular replenishment
1Rp 8.1M19 Aug 2026168 d
20 Aug 2025PR03
Regular replenishment
2Rp 8.0M27 Jul 2026341 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
21 Aug 2026LowPX_PP-254APP-254A high vibration
13 Jun 2025LowPX_PP-254AInstall scaffolding at PP-254A

Recent goods issues

Posting dateQtyOrderOrder type
18 Dec 20252201000025045Corrective