SLEEVE,SHAFT,DWG.810-1359,FOR PP-254A
Material 4300056488 · SLEEVE · Plant 1000
CMonitorSlow-moving
- Material
- 4300056488
- Category
- SLEEVE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- RAJAWALI PERKASA JAYA PT
- Lead time
- 191 d · P80 297 d
- Unit price
- Rp 8.1M
Recommendation
- 1.Forecast 0.7 EA/year: 0.7 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~191 days; expected demand during lead time 0.4.
- 3.A 83.0% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
Single sourceOpen PO
On hand / on order
2 / 2
next delivery 25 Jan 2027
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
83.0%
stockout risk now 0%
Unit price
Rp 8.1M
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 287 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 10.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~67 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-254A SPENT CAUSTIC PUMP | C | 1 | 2 | 0.62 |
Lead time and procurement
Lead time 191 ± 71 days (PO history, 3 PO lines) · on-time 15%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 07 Jun 2026 | PR03 Regular replenishment | 2 | Rp 8.1M | 25 Jan 2027 open | 232 d |
| 04 Mar 2026 | PR03 Regular replenishment | 1 | Rp 8.1M | 19 Aug 2026 | 168 d |
| 20 Aug 2025 | PR03 Regular replenishment | 2 | Rp 8.0M | 27 Jul 2026 | 341 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 21 Aug 2026 | Low | PX_PP-254A | PP-254A high vibration |
| 13 Jun 2025 | Low | PX_PP-254A | Install scaffolding at PP-254A |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 18 Dec 2025 | 2 | 201000025045 | Corrective |