Sparely
DU

DEMISTER PAD,DWG.167-2603,FOR CL-348

Material 4300057082 · DEMISTER PAD · Plant 1000

BLong-leadReorderCriticalStockout
Material
4300057082
Category
DEMISTER PAD
Base unit
EA
MRP type
Non Stock
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
MEGA ENERGI ABADI PT
Lead time
131 d · P80 147 d
Unit price
Rp 42.1M

Recommendation

  • 1.Forecast 0.5 EA/year: 0.5 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~131 days; expected demand during lead time 0.2.
  • 3.A 98.7% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 2 now.
  • 5.Long lead time: 80% of deliveries took up to 147 days and the fastest seen in its category 34 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
2 EA
Rp 84.2M · order by 01 Oct 2026
Expected arrival ≈ 131 days
Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
98.7%
stockout risk now 16%
Unit price
Rp 42.1M
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 200 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 88.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~34 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_CL-348
SEAL OIL TOWER
B130.81

Lead time and procurement

Lead time 131 ± 59 days (PO history + category, 1 PO lines) · on-time 40%

PR dateTypeQtyUnit priceDeliveryLead time
13 Oct 2025PR05
Project / turnaround
1Rp 42.1M27 May 2026226 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
10 Sept 2026LowPX_CL-348Leak from packing
15 Mar 2026LowPX_CL-348Install scaffolding at CL-348
22 May 2025MediumPX_CL-348PSM25/[MSI-B-25-GCX-389] Permanent repai

Recent goods issues

Posting dateQtyOrderOrder type
15 Mar 20261201000031899Corrective