SPRING,SAFETY VALVE,DWG.884-7624,FOR PRV

Material 4300057277 · SPRING · Plant 1000

SSafety-criticalLong-leadMaintainInsurance gap
Material
4300057277
Category
SPRING
Base unit
EA
MRP type
Non Stock
Criticality
S (0 of 1 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
BERKAH REFRAKTORI PRATAMA PT
Lead time
174 d · P80 267 d
Unit price
Rp 7.8M

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s) (equipment criticality S). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 3.Lead time ~174 days; expected demand during lead time 0.0.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 5.Long lead time: 80% of deliveries took up to 267 days and the fastest seen in its category 77 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
Safety-critical (SCE)Long-leadSingle sourceOpen PO
On hand / on order
0 / 3
next delivery 28 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
99.9%
stockout risk now 0%
Unit price
Rp 7.8M
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~77 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PRV-644A
SAFETY VALVE VD-855B
S100.04

Lead time and procurement

Lead time 174 ± 80 days (PO history, 3 PO lines) · on-time 43%

PR dateTypeQtyUnit priceDeliveryLead time
26 Jul 2026PR06
Regular replenishment
1Rp 7.7M27 Apr 2027
open
275 d
17 Jul 2026PR06
Regular replenishment
2Rp 7.8M28 Oct 2026
open
103 d
25 Dec 2025PR03
Regular replenishment
2Rp 8.0M07 Sept 2026256 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Never issued in the 17-month history.