POSITIONER,VALVE,DWG.565-2072,FOR PCV-15
Material 4300057944 · POSITIONER · Plant 1000
CMaintainNo stock needed
- Material
- 4300057944
- Category
- POSITIONER
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- KARYA ENERGI SENTOSA PT
- Lead time
- 121 d · P80 191 d
- Unit price
- Rp 71.4M
Recommendation
- 1.Forecast 0.9 EA/year: 0.9 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~121 days; expected demand during lead time 0.3.
- 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 14%
Unit price
Rp 71.4M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 67 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 7.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~40 days.
Installed on 1 functional locations
0 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PCV-1584D PRESSURE CONTROL VALVE | C | 3 | 1 | 0.08 |
Lead time and procurement
Lead time 121 ± 69 days (PO history, 3 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 21 Jul 2026 | PR04 Regular (other) | 1 | Rp 72.2M | 28 Sept 2026 | 69 d |
| 24 Sept 2025 | PR05 Project / turnaround | 1 | Rp 71.4M | 27 Apr 2026 | 215 d |
| 24 May 2025 | PR05 Project / turnaround | 2 | Rp 69.8M | 25 Oct 2025 | 154 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 10 May 2025 | Low | PX_PCV-1584D | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 26 Jul 2026 | 2 | 201000005472 | Corrective |