TRIM SET,CONTROL VALVE,DWG.454-6033,FOR
Material 4300057946 · TRIM SET · Plant 1000
CReducePotentially obsolete
- Material
- 4300057946
- Category
- TRIM SET
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 159 d · P80 236 d
- Unit price
- Rp 78.5M (est.)
Recommendation
- 1.Forecast 0.1 SET/year: 0.1 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~159 days; expected demand during lead time 0.0.
- 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
- 4.Stock 20 exceeds the level to keep (0) by 20.
Price estimatedLead time estimated
On hand / on order
20 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 78.5M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~75 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FCV-1967 CONTROL VALVE | C | 1 | 6 | 2.25 |
Lead time and procurement
Lead time 159 ± 83 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 09 Jun 2026 | Medium | PX_FCV-1967 | FCV-1967 passing |
| 12 Apr 2026 | Medium | PX_FCV-1967 | FCV-1967; IA leak from regulator |
| 21 Jan 2026 | Medium | PX_FCV-1967 | FCV-1967; IA leak from regulator |
| 11 Jan 2026 | Medium | PX_FCV-1967 | FCV-1967; small leak at packing |
| 01 Nov 2025 | Low | PX_FCV-1967 | Install scaffolding at FCV-1967 |
| 23 Jul 2025 | Medium | PX_FCV-1967 | FCV-1967 passing |
Recent goods issues
Never issued in the 17-month history.