COUPLING,DWG.110-3320,FOR PP-203B
Material 4300058464 · COUPLING · Plant 1000
SReducePotentially obsolete
- Material
- 4300058464
- Category
- COUPLING
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- S (0 of 1 FuncLocs A/B)
- Supplier
- PRIMA ELEKTRIK ABADI PT
- Lead time
- 92 d · P80 139 d
- Unit price
- Rp 11.7M
Recommendation
- 1.Forecast 0.1 SET/year: 0.1 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~92 days; expected demand during lead time 0.0.
- 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
- 4.Stock 2 exceeds the level to keep (0) by 2.
Convert to Non StockSingle source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 11.7M
PO history
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 300,473/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~44 days.
Installed on 1 functional locations
0 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PY_PP-203B DEMIN WATER PUMP | S | 4 | 7 | 2.76 |
Lead time and procurement
Lead time 92 ± 54 days (PO history + category, 1 PO lines) · on-time 30%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 05 Jan 2026 | PR03 Regular replenishment | 2 | Rp 11.7M | 26 Apr 2026 | 111 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 17 Aug 2026 | Medium | PY_PP-203B | Overhaul PP-203B |
| 14 Aug 2026 | Medium | PY_PP-203B | PP-203B high vibration |
| 09 Jul 2026 | Medium | PY_PP-203B | Painting PP-203B |
| 17 Feb 2026 | Medium | PY_PP-203B | [MSI-B-26-FRN-294/M] Replace line |
| 02 Dec 2025 | Medium | PY_PP-203B | Replace lamp as per PM finding |
| 31 Oct 2025 | Low | PY_PP-203B | [MSI-B-25-HVK-154/M] Replace line |
| 11 Jun 2025 | Low | PY_PP-203B | PP-203B seal leak |
Recent goods issues
Never issued in the 17-month history.